How to read a P&ID: ISA-5.1 letters, instrument bubbles and signal lines

On a P&ID every instrument carries a tag such as PIC-101. The first letter says what is measured (P for pressure), the following letters say what the instrument does (I indicates, C controls), and the number identifies the loop. The shape of the bubble tells you where the function lives (in the field, in the control room, in the PLC) and the line style tells you how the signal travels. That is enough to read most drawings.

Published 27 October 2026 · 5 min · by Antoine Despres, Consigne

What a P&ID is

A P&ID (piping and instrumentation diagram) shows the equipment of a process, the piping that connects it, the instruments that measure it and the loops that control it. It is used for design, construction and commissioning, then throughout operation. It is often the reference document behind a supervision screen.

The instrument tag: PIC-101

A tag reads in three parts: the measured variable, the functions, the loop number.

PartExampleMeaning
First letterPICmeasured variable: pressure
Following lettersPICfunctions: indicator, controller
Number101loop 101, often tied to an area or a piece of equipment

A modifier letter can follow the first letter: PD for differential pressure, FQ for totalised flow.

The most common first letters

LetterVariable
Aanalysis (pH, conductivity, oxygen and so on)
Fflow
Llevel
Ppressure
Ttemperature
Sspeed
Zposition
Hhand (manual)

The most common function letters

LetterFunction
Iindicate
Rrecord
Ccontrol
Ttransmit (transmitter)
Sswitch
Aalarm
Vvalve, final control element
Eprimary element, sensor
H, Lhigh, low (used with S or A)

A few readings: TT temperature transmitter; LIC level indicating controller; LSH level switch high; PSHH pressure switch high-high; FV flow control valve; ZS position switch.

The letters are read by position, not by meaning alone. In TT, the first T is temperature and the second is transmit. In PSH, the S is a switch because it comes after the first letter; as a first letter, S would mean speed.

The bubble shape: where the function lives

The bubble (the circle around the tag) tells you where the instrument or function sits, and whether the operator can reach it.

ShapeUsual meaning
plain circlefield-mounted instrument
circle with a solid horizontal linein the control room, accessible to the operator
circle with a dashed horizontal linein the control room, behind the panel, not accessible
circle inside a squareshared display function of a control system (DCS), shown on screen
hexagoncomputer function
diamond inside a squarefunction performed by a PLC

The same shapes with a double line usually mean a local panel outside the control room. The project legend confirms it.

The lines: how the signal travels

LineUsual meaning
thick solid lineprocess piping
thin line crossed by pairs of short diagonal strokes at intervalspneumatic signal
dashed lineelectrical signal
thin line with crossescapillary tube
thin line with small circlesdata link, software link
thin line with small L shapeshydraulic signal

An arrow on a pipe shows the flow direction. An off-page connector (a pentagon with a reference) tells you where the line continues.

Equipment

Equipment tags are less strictly standardised than instrument tags. You will often see P-101 for a pump, V- or T- for a vessel or tank, E- for a heat exchanger and K- for a compressor. The symbols follow recognisable shapes:

FamilyTypical shapes
Valvestwo triangles point to point (the bow-tie), with a circle (ball), a line (butterfly), or an actuator on top (motor-operated, pneumatic, solenoid)
Pumpscircle with a tangential outlet (centrifugal), variants for positive displacement, metering and screw pumps
Vesselsvertical or horizontal cylinder, sphere, floating roof, jacketed, with coil
Heat exchangersshell and tube, plate, air cooler
Separationseparator, cyclone, filter, Y strainer

A control loop, read end to end

Take level control on a tank:

  1. LT-201, plain circle on the tank: level transmitter in the field.
  2. A dashed line, or a line with small circles, runs to LIC-201 in a circle inside a square: indication and control are in the DCS, on the operator's screen.
  3. Another line runs to LV-201 on the outlet pipe: the control valve, with its actuator.
  4. LSH-201 and LAH-201, if shown, add a high level switch and a high level alarm.

The number 201 ties together every element of the same loop. It is the number you will find again in the I/O list, in the PLC program and on the supervision screen.

Three mistakes beginners make

  • Reading the bubble as the instrument. A circle inside a square is not a device you can touch: it is a function on a screen. The physical transmitter is the plain circle.
  • Ignoring the line style. A pneumatic signal and an electrical signal look alike at first glance. On a brownfield site the difference decides what you wire, and what fails safe on loss of air or power.
  • Assuming every project uses the same letters. Some sites assign their own meaning to letters the standard leaves to the user. The legend sheet settles it.

From the P&ID to the supervision screen

An HMI process graphic does not copy the P&ID. It keeps what the operator needs to run the plant. Symbols are simpler, the state (running, stopped, fault, open, closed) shows through colour or shape, and values are displayed next to the equipment. High-performance HMI principles ask for a neutral background and little colour, kept for abnormal situations. The guide High-performance HMI: 8 rules for a web screen develops them.

Ready-made symbols

pid-symbols provides 117 symbols drawn on the same grid, in 11 families (valves, pumps, rotating machines, vessels, heat exchangers, separation, water treatment, HVAC, electrical, instruments with the bubbles and the PIC, TIC, FIC, LIC loops, piping and lines), as SVG, PNG and a draw.io library with English names. In a web HMI, states animate through CSS classes. The shapes follow the usual conventions (ISA-5.1, ISO 10628), with no certification or affiliation, and there is no Visio stencil or Figma library in this version (the SVG and PNG files drag and drop into both). To assemble symbols into an animated screen, see the SVG process graphic.

Sources

  • ANSI/ISA-5.1, Instrumentation Symbols and Identification (not reproduced; common conventions summarised)
  • ISO 10628, Diagrams for the chemical and petrochemical industry (not reproduced)
  • ISO 14617, Graphical symbols for diagrams (not reproduced)

More guides